Base type:Pile

Looking for high-quality piles? Look no further! As a leading factory, we offer a wide range of durable and reliable piles for your construction needs.

Request a Quote
  • Base type:Pile

PRODUCTS DETAILS

WindSpeed : < 42m/s Snowload : 1 4KN/m2 standard: AS1170.2 Degree: 0*-70 Arangement: Vertical Warranty: 10 years1 Install pile frst and then install column upon pile. And then, istall main beam and diagonal I brace on this column. 2 Install mounting rail upon mainbeam 3 tallPrl panels bv mid demp and end clamps.
Mounting rail ,Main beam, Diagonal brace, Back support Ground screw Single Post End clamp kit Mid clamp kit
 Concrete slab flat roof solar mounting (3)  Base typePile (1)  Concrete slab flat roof solar mounting (1)  Metal roof solar mounting (3)  Metal roof solar mounting (2)
Two rows panels with vertical, this is normal type solar mounting system for ground. Ground screw 2 rows panels with vertical solar mounting systemSpecification: Wind Speed : < 42m/s Snow load : 1 .4 KN/m2 Standard : AS1170.2 Degree: 0-70 Arrangement : Vertical Warranty: 10years Installation Manual: 1.Install Piles first, and then install column upon pile. And then install main beam and diagonal brace. Diagonal brace from rear post to main beam. 2.Install mounting rail upon main beam 3.Install PV panels by mid clamp and end clamps.Main parts shown as bellowGround screw 3 rows with landscape solar mounting system According to actual factors and requirements, sometimes 3 panels with landscape type will be used.Specification: Wind Speed :< 42m/s Snow load :1.4 KN/m2 Standard :AS1170.2 Degree :0°-70 Arrangement :Horizontal Warranty:10 years Installation Manual: 1.Install Piles first, and then install column upon pile. And then install main beam(horizontal) and back support on 2 rear columns. Here Diagonal brace will be connected from rear post to front post. 2.Install mounting rail upon main beam. 3.Install PV panels by mid clamp and end clamps.Main parts shown as bellowGround screw 4 rows with landscape solar mounting system This 4 panels with landscape will be used usually on open filed and big power station.
SpecificationWind Speed < 42m/s Degree 0°-70 Snow load 1.4 KN/m2Arrangement: Horizontal Standard AS1170.2Warranty10 years
Installation Manual: ]1.Install  Piles first,  and then  install  posts  upon  pile.  Install  main  beam  and  diagonal brace. Here Diagonal brace will be connected from rear post to main beam. 2.Install mounting rail upon main beam, here notice there are 5 mounting rails. 3.Install PV panels by mid clamp and end clamps.
Main parts shown as bellowGround screw 4-5 rows with vertical solar mounting system Chasun Solar also provide aluminum alloy structure 4-5 rows of panels with landscape array.
 Specification Wind Speed < 42m/s Degree 0°-70  Snow load 1.4 KN/m2 Arrangement: Horizontal Standard AS1170.2 Warranty10 years
Installation Manual: 1.Install Piles first, and then install column upon pile. And then install main beam, and then install secondary beam with landscape. 2.Install mounting rail upon secondary beam. 3.Install PV panels by mid clamp and end clamps.
Main parts shown as bellowE-pile solar mounting system with 2 rows This type of solar mounting system usually used for Europe market big power station. Easy to install and save labor cost.
Specification:Wind Speed :< 42m/s Degree :0°-70 Snow load :1.4 KN/m2Arrangement :Vertical Standard :AS1170.2Warranty:10 years
Installation Manual:Installation Manual:1.Install Pile first, And then install main beam and diagonal brace on this column. 2.Install mounting rail upon main beam 3.Install PV panels by mid clamp and end clamps 4.Here for pile, we can use    “∑ ”or    “几”type
Main parts shown as bellowConcrete pile solar mounting system This type solar mounting system mainly use for some area which is hard to use normal pile or concrete foundation as base. Also its structure usually used for lake or low-lever ground area.Specification: Wind Speed : < 42m/s Snow load: 1.4 KN/m2 Standard: AS1170.2 Degree: 0°-70 Arrangement : Vertical Warranty: 10 years Installation Manual: 1 Install Concrete and Pile frst, make concrete pile and take steel pile in it. and then install column upon pile. And then install main beam and diagonal braces on thiscolumn. 2.Install mounting rail upon main beam 3.Install PV panels by mid clamp and end clamps.Main parts shown as bellow

Hot Products

Trina Vertex S+  TSM-NEG9RC.27 415-440W

Trina Vertex S+ TSM-NEG9RC.27 415-440W

JA DEEP BLUE 3.0   JAM72D30 LB 555-580

JA DEEP BLUE 3.0 JAM72D30 LB 555-580

RISEN TITANS  RSM120-8-585BMDG-610BMDG

RISEN TITANS RSM120-8-585BMDG-610BMDG

YINGLI PANDA 3.0 PRO 405-430W YL430CF-54e 1/2

YINGLI PANDA 3.0 PRO 405-430W YL430CF-54e 1/2

GROWATT Battery System ARK HV Battery

GROWATT Battery System ARK HV Battery

JA DEEP BLUE 3.0  JAM78S30 580-605/MR

JA DEEP BLUE 3.0 JAM78S30 580-605/MR

JA DEEP BLUE 4.0  NAM54D41 400-425/GB

JA DEEP BLUE 4.0 NAM54D41 400-425/GB

Trina Vertex N  TSM-DE18M(II) 490-515W

Trina Vertex N TSM-DE18M(II) 490-515W

JA DEEP BLUE 4.0  n-type JAM72D40 555-580/GB

JA DEEP BLUE 4.0 n-type JAM72D40 555-580/GB

Trina Vertex S  TSM-DE09 390-405W

Trina Vertex S TSM-DE09 390-405W

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours